Construction resumes on Perma bridge over Flathead River
The Montana Department of Transportation and Frontier West are resuming work on the bridge that carries Secondary Highway 382 over the Flathead River near Perma this week, weather and other factors permitting.
Planned work for this construction season includes removing and replacing the pavement on the bridge approaches, upgrading guardrail, painting portions of the steel structure, installing advance warning rumble strips and signage, and applying final pavement markings.
Traffic will be reduced to one lane over the bridge and controlled by temporary signals. A 10-foot width restriction will be in place during painting work. The river beneath the bridge will remain open, but signage may direct boat or raft traffic to one side of the river at a time. All work on this project is anticipated to be completed by fall.
Become a Subscriber!
You have read all of your free articles this month. Select a plan below to start your subscription today.
Already a subscriber? Login